Skip to main content

Flatbed carriers, owner-operators, dispatchers, safety teams, and load planners

Flatbed Load Planning Toolkit

A free interactive flatbed load checklist and printable planning record for comparing all-mile economics and carrier-entered equipment fit while organizing cargo facts, securement review, route and permit questions, loading hazards, inspection timing, documents, and exception handling.

Reviewed July 20, 202612-minute flatbed planning reviewFree web and PDF access
Download the PDF

Interactive planning worksheet

Compare the move, cargo, and carrier-entered equipment.

Use the exact flatbed configuration and values the carrier would operate. The worksheet compares the entries and organizes review; it does not calculate required tiedowns or working load limits, determine legal size or weight, approve permits, certify securement, or decide whether the load should move. Commercial inputs remain in this browser. Analytics records only the result band, equipment-fit status, and checklist count.

Whole-move economics

Use the carrier's own operating records and include flatbed-specific exposure.

Carrier-entered equipment comparison

Compare source cargo facts with the exact equipment values supplied or verified by the carrier. This is not a legal-limit or securement calculation.

Carrier planning review

Gate 1

Preserve the current cargo and source facts

A flatbed label does not establish the article count, dimensions, weight, center of gravity, loading method, securement method, or current availability. Keep source facts and unanswered questions attached to the decision.

Current source record

Record the authorized source, load ID, availability recheck time, locations, stops, appointments, contact path, rate, and every source restriction or unresolved item.

Cargo identity

Record commodity, piece count, individual and total weight, dimensions, packaging, orientation, shape, rolling or tipping tendency, center-of-gravity concerns, and declared condition.

Loading and unloading

Confirm crane, forklift, drive-on, side-load, rear-load, or other method; site access; appointment duration; driver-assist expectations; and who controls placement.

Unknowns stop the plan

Treat missing cargo, equipment, route, securement, permit, appointment, accessorial, payment, or contact facts as questions. Do not fill gaps with a typical flatbed assumption.

Gate 2

Compare the exact trailer and loading fit

Use records for the equipment configuration that would actually move the load. The interactive worksheet compares carrier-entered values only and does not determine legal or safe capacity.

Trailer configuration

Record trailer type, deck length and height, axle configuration, ratings, usable deck, headboard or bulkhead, rub rails, anchor points, ramps, dunnage, tarps, and carried equipment.

Available payload

Use current carrier records after tractor, trailer, fuel, driver, tools, chains, binders, straps, tarps, dunnage, and other carried weight. Preserve scale evidence when required.

Placement and distribution

Have qualified carrier personnel review article placement, axle and gross weight, concentration, balance, center of gravity, overhang, clearance, turning, and loading constraints.

Stop on mismatch

A cargo-weight or longest-piece mismatch requires equipment, placement, route, dimension, permit, and securement review. The worksheet does not authorize an alternative configuration.

Gate 3

Build the securement review from current rules and ratings

Securement depends on the actual articles, vehicle, structures, devices, ratings, arrangement, and applicable general and commodity-specific requirements. Do not use this page as a tiedown-count or working-load-limit calculator.

Applicable rule set

Review 49 CFR part 393, subpart I and any commodity-specific section that applies. Commodity-specific requirements can add to or supersede parts of the general method.

Devices and structures

Inspect tiedowns, chains, straps, binders, anchor points, front-end structures, blocking, bracing, chocks, wedges, cradles, dunnage, and protection for damage, weakening, markings, and proper use.

Qualified securement plan

Have qualified carrier personnel determine required devices, aggregate working load limit, article restraint, placement, direct or indirect attachment, blocking, bracing, rolling prevention, and edge protection.

No generic approval

A checked box records that review occurred; it does not prove the selected method, device rating, tiedown count, inspection result, or regulatory compliance.

Gate 4

Resolve route, permits, time, and whole-move economics

A workable securement concept is not enough. Confirm every jurisdiction, route restriction, operating window, cost, and carrier approval before the move is accepted.

Route and jurisdictions

Review origin, destination, intermediate jurisdictions, local roads, bridges, construction, grades, turns, clearances, weather, wind exposure, parking, and facility access.

Size, weight, and permits

Compare the actual loaded configuration with current federal, state, local, toll-road, and facility requirements. State and other authorities issue permits; this worksheet does not.

All-mile estimate

Use loaded miles, pickup deadhead, expected repositioning, the truck's operating cost per mile, and flatbed-specific costs such as tarps, dunnage, permits, escorts, loading help, tolls, scales, and parking.

Time and accessorials

Confirm appointments, loading and unloading time, tarping exposure, stops, detention evidence, layover, TONU, permits, escorts, driver assist, and reload effect.

Gate 5

Control loading, inspection, and driver handoff

Preserve what was actually loaded, secured, inspected, and communicated. The final configuration can differ from the source description and must be reviewed before departure.

Loading record

Record article placement, orientation, dimensions, weights, devices, anchor points, blocking, bracing, dunnage, tarps, edge protection, exceptions, loader, driver, and time.

Pre-departure inspection

Confirm cargo distribution and securement, vehicle components, tarps and equipment, visibility, movement, emergency access, and every carrier-required condition before the vehicle moves.

Reexamination plan

Plan the inspections and adjustments required by current 49 CFR 392.9 and any applicable exception, plus stricter carrier, commodity, permit, customer, or jurisdiction requirements.

Driver handoff

Provide the route and permit packet, inspection schedule, adjustment tools and supplies, weather and stop-work triggers, contact chain, document process, and escalation authority.

Gate 6

Record the carrier decision and actual result

This resource organizes the review; it does not approve securement, certify safety, issue a permit, or book freight. The authorized carrier retains the decision.

Carrier decision

Record approval, rejection, conditions, open questions, decision owner, time, exact equipment, and the source and documents reviewed.

In-transit exceptions

Preserve shift, looseness, damage, weather, route, permit, delay, securement, tarp, equipment, inspection, and communication events without rewriting the pickup record.

Delivery evidence

Record arrival, seal when used, securement and cargo observations, unloading condition, signed documents, photos when authorized, exceptions, and disposition instructions.

Planned versus actual

Compare miles, time, fuel, permits, escorts, loading, securement supplies, accessorial recovery, service, exceptions, and estimated versus actual cost.

Corrections and partner use

Link to this resource freely. For corrections, classroom use, accessibility formats, or a reviewed collaboration, contact LoadLadder with the exact section and proposed change.

Propose a collaboration

LoadLadder Road Desk

Loads, rates, lanes, one place

Try asking: